Holy Trinity
Holy Trinity

Northerly Group completed the church and parish centre in Malaga in August 2011.

The main structure of the building included concrete tilt panel walls which were fabricated on site, structural steel with a colourbond roof. The internal construction was a mixture of brickwork and stud frames plasterboard walls on concrete. The building’s air conditioning included three large evaporative units in the worship space, and the offices and meeting/craft rooms were fitted out with cassette systems.

A stainless steel kitchen was installed along with male, female and disable toilets.

The building was complete ahead of programme.

Project Overview

Client: The Anglican Diocese

Contract Duration: 8 months

Project Status: Completed 2011